TLDRThe video script details a DIY home renovation project focusing on the construction of a roof addition with three different roof lines. The non-professional builders take a step-by-step approach, starting with the main rafters and moving on to the more challenging hip rafters. They devise a plan using a mockup to ensure accurate cuts for the 2x2 rafters, which are crucial for tying into the existing structure. Amidst the construction, they also address a mishap with a table at their cafe, where a polyurethane application was ruined by dew, leading to a decision to refinish the table. The video also includes a humorous interaction with a dog named Hy, and a mention of a Helix mattress promotion. The project continues with the installation of rafters, framing, and sheathing, all while managing the challenges of weather and the need to maintain the structural integrity of the new addition. The video concludes with a look at the cafe's operations, featuring a popular chickpea and spinach curry, and a glimpse into the lives of the renovation team's animals, including newborn lambs and a donkey named Rosa.
Takeaways
- 🏠 The project involves constructing an addition to a house with three different roof lines that need to be integrated.
- 🛠️ The main rafters have been installed, but the hip rafters and their connection to the other roof lines present a challenge.
- 📈 As each rafter is installed, the house begins to take shape, and the construction process is tackled step by step.
- ✂️ There are approximately 25 rafters left to cut for the project, which will be done methodically, one by one.
- 🎨 The individual responsible for the project apologizes for the time it's taking and offers to do the painting as part of the commitment.
- 🚪 A table from a cafe is being refinished due to an issue with the polyurethane application that was affected by dew.
- 🔨 An orbital sander and planer are used to address the refinishing of the table, which will require restaining and a new coat of polyurethane.
- 👶 The narrator mentions the demands of lambing season, which includes nightly responsibilities of bottle-feeding baby lambs.
- 🛏️ A sponsorship mention for Helix mattresses is included, highlighting a Memorial Day sale and the benefits of their customized mattresses.
- 📦 The packaging of soap bars for restocking at a cafe is described, indicating a variety of scents available.
- ☔️ Weather conditions, including rain and thunder, require the construction work to be temporarily halted.
Q & A
What is the main challenge the speaker is facing with the roof construction?
-The main challenge is figuring out the hip rafters and how all three roof lines will properly tie into each other, despite not being professionals in construction.
How does the speaker plan to tackle the remaining 2x2 rafters?
-The speaker plans to cut and fit each rafter one by one, using a mockup that they have found to fit perfectly as a guide.
What issue did the speaker encounter with the tables from the cafe?
-The tables were left outside to dry after applying poly, but dew covered them the next morning, which messed up the poly finish.
What is the solution to fix the tables after the poly issue?
-The solution is to use an orbital sander to sand down the tables, then reapply a fresh coat of stain and poly.
What is the purpose of the 2x2 rafters that the speaker mentions?
-The 2x2 rafters are used to support the roof structure, with some being doubled up and others running from the bridge beam to tie into the wall on different floors.
What is the significance of the window in Ellie's Loft?
-The window in Ellie's Loft is important for safety reasons, as it serves as a potential fire escape route.
What is the name of the first baby donkey mentioned in the script?
-The first baby donkey is named Stanley.
What is the most popular breakfast item at the cafe?
-The most popular breakfast item is the egg Sammy served on fashi bread with a secret sauce.
What is the special lunch item that Deana has prepared for the cafe?
-Deana has prepared a chickpea and spinach curry for lunch, which was well-received the previous day.
What is the speaker's strategy for dealing with the weather changes during construction?
-The speaker monitors the weather closely and decides to stop work and go inside when the temperature drops and rain is imminent.
What is the speaker's attitude towards the progress of the construction project?
-The speaker is patient and methodical, taking the project step by step and learning as they go, despite the challenges they face.
What is the role of Helix in the video script?
-Helix is the sponsor of the video, promoting their Memorial Day sale and their customized mattresses, which the speaker highly recommends.
Outlines
🏠 Roof Framing and Table Restoration Project
The video begins with a discussion on the challenges of framing a roof with three different roof lines for an addition to a house. The host admits they are not professionals and are tackling the project step by step. After installing the main rafters, they focus on the hip rafters and ensuring the roof lines connect properly. The process is iterative, with each rafter being cut and fitted carefully. The host also mentions a side project of refinishing a table from a cafe that was ruined by dew after a coat of polyurethane was applied. They use an orbital sander and planer to restore the table and prepare it for a new coat of polyurethane.
🛠️ Continuing Roof Construction and Product Endorsement
The host continues with the construction project, focusing on finishing up the 2x2 rafters that extend past a loft area and connect to another part of the house. They mention having about 25 rafters left to cut and fit. The video also includes a product endorsement for Helix mattresses, discussing the customization options available through their Sleep quiz and the benefits of their mattresses, including a 100-night sleep trial and a 10-year warranty. The host shares their personal experience with the Helix mattress, emphasizing its comfort and support.
🚪 Framing the Back Wall and Window Installation
The video moves on to framing the back wall of the house, which involves cutting and installing additional rafters and completing the wall framing on the second floor. The host emphasizes the importance of having a window in the loft for emergency escape in case of a fire. They discuss the process of installing top plates and 2x6 studs, and the need to double up the rafters and secure them to the knee wall and LVL beam. The video also includes a musical interlude and a segment on the host's interactions with their pets.
☔️ Weather Changes and Cafe Update
The video concludes with a shift in weather, signaling the end of outdoor work for the day. The host then provides an update on their cafe, which has been open for three weeks and is popular for its pastries and lunch specials, such as chickpea and spinach curry. The host also shares their excitement about the arrival of new animals on their farm, including baby lambs and a new baby donkey named Stanley, and they show off their affection for their pets, including a donkey named Dash.
Mindmap
Keywords
💡Roofing
💡Rafters
💡Hip Rafters
💡Mockup
💡Polyurethane (Poly)
💡Orbital Sander
💡Planer
💡Staining
💡Wall Framing
💡Sheathing
💡Subfloor
Highlights
The construction process involves three different roof lines tying together, which presents a challenge due to the lack of professional experience.
Cutting and installing the main rafters has been the easy part, while figuring out the hip rafters and their integration is more complex.
The project involves taking a step-by-step approach to ensure each part of the structure fits correctly.
A mockup is used to trace and cut the 2x2 rafters, ensuring a consistent fit throughout the build.
There are about 25 rafters left to cut and install, which will connect to the existing structure and LA's Loft.
A table from the cafe had to be sanded down and refinished due to a mishap with dew affecting the polyurethane finish.
An orbital sander and planer are used to salvage the table, requiring restaining and a new coat of polyurethane.
The process of constructing the back wall involves cutting subfloor, framing, and sheathing.
Two specific rafters are highlighted as they will run from the bridge beam to different levels of the house.
Framing the back wall is a significant step towards closing in the structure and proceeding with further construction.
The cafe has been successful, with pastries selling out quickly and a popular chickpea and spinach curry special.
The importance of having a fire escape plan, including a double hung window in the loft for emergency egress.
The use of a Helix mattress, customized through a sleep quiz, is highlighted for its comfort and suitability for different sleep preferences.
The Helix mattress comes with a 100-night sleep trial, a 10-year warranty, and financing options.
A new baby donkey named Stanley is introduced, signifying the arrival of spring and new life on the farm.
The construction process is shown to be weather-dependent, with rain causing a halt in outdoor work.
The transcript provides a detailed account of DIY construction challenges and solutions, offering insights to a broad audience interested in home improvement.
Transcripts
previously we began framing the roof of
our addition there's three different
roof lines that are going to be tying in
together and we're not professionals so
we're taking it step by step cutting and
installing the main Rafters has been the
easy part figuring out the hip Rafters
and how all three roof lines will
properly tie into each other is a
different story it might not work though
but I have no idea to that perfect as
each rafter goes up we start to see the
house take shape and little by little we
successfully work through the steps to
pull this build together we going to go
one by one one by one girl cut and fit
cut and fit but I have have a pretty
good plan
now today I'm going to get started on
finishing up all the 2x2 Rafters that
are going down past LA's Loft and tied
into the other portion of the house
about 25 Rafters left to cut I'm going
to throw my mockup on top Trace cut and
start knocking that roof L
out that's okay
[Music]
I'm sorry about this project Mama I'll
do all the painting it's been a project
I've been needing to get to for
months just the cord drag it all the way
out okay we're just going to sand it
down real quick and then we're going to
go through and ply once we get all these
rough spots pulled away Hy don't eat the
camera
we brought home one of the tables from
the cafe we weren't happy with the way
that any of the tables turned out but
this one in particular is especially bad
unfortunately after the poly had
initially been applied we left all of
the tables outside thinking that they
would dry but instead the next morning
when we went to check on them they were
covered with Dew and it just messed up
the Poly on pretty much every single
table today Ellie and I are going to
finally pull that Band-Aid off we're
going to go through with an orbital
sander and then hope hopefully this next
coat of poly that we apply is the last
one day and
night the world is
noisy and that's all
right every sound is just
a the natural around
the key to this grof so far is that
mockup we struggled a little bit trying
to get that thing perfect so it fits
both sides but once we found that right
cut for both ends of the rafter we kept
that board and used that as our mockup
and we put it on every single 2x2 traced
it and cut it out and now it makes
everything go in flawlessly and it's
exactly the same the entire way down
throw that's Crown okay
[Music]
cool right
[Music]
[Music]
how's it going it's
not it's in a lot worse shape than I
thought and I just don't think this is
going to cut it sticky it's sticky and
it's almost like I need to scrape it but
this isn't doing a good enough job you
we got playing the entire thing it's a
great idea yeah yeah exact we're going
to do I have been trying and trying with
no avail to get this sander to do the
job that I need it to do but it's just
not happening so Josh has the genius
idea to take his planer to the top of
the table now that does mean that we're
going to have an entire top layer of the
table removed and therefore we're not
only going to need to poly the table but
we're actually going to need to go back
in and restain and then repo the table
but I guess on the bright side we're
going to be able to salvage the table
and that's all that really
matters that's going to work oh yeah
we're good
[Applause]
[Music]
thank you for doing my job oh you're
welcome thank you
Bab I'll take it from here by it's in
rough shap it's not done
yet looks so much
better like we're starting from scratch
so we are back to starting with a clean
slate we're just going to hit it with
the 60 grit and then the 120 grit and
then we can finally put a Fresh coat of
stain and Poly on there and we're back
in
[Music]
business all I got two my 16 in I'm
going to double these Raptors up as I
mentioned before the majority of the
Raptors are going towards the existing
A-frame but two of those Rafters need to
be saved so they go on the back portion
of the house we get the back wall
completed these two Rafters run from the
Bridge beam and the one side comes and
ties into the wall on the second floor
the other one goes straight down to the
first floor and ties in getting these
rafs installed is going to allow us to
finish the wall framing in The Loft and
also complete the wall framing on the
second floor which will then allow us to
Shi the back side the house
D there you go
Perfect Look a
[Music]
[Music]
glove we're now at the point we're going
to start framing the back wall and
getting everything closed in but the
first thing we need to do is cut that
subfloor off we put full sheets down and
uh it's been hanging off the side for a
while now so we got to chalk a line cut
it put a 2x6 down we can start
framing I so wish I would have done this
earlier Timber
oh man
[Music]
[Music]
and I believe how much eggs I got was it
a good day yeah be sure you wash your
hands
okay do you want a package the lavender
and lemongrass or the mountain mint so
Mountain mint
okay oh my goodness we have some of all
of the bars so we'll just go one at a
time I can make the boxes and you can do
the packing okay this is my favorite
right here that's Mountain mint yeah
that one my actual
favorite I think you say that about
every
bar I do we'll get these all packaged up
and we can drop them off at the cafe
tomorrow okay we've got one of every
single bar so we can do a total restock
when we get to the cafe okay okay I can
get him open house thank you so much
welcome
[Music]
Helix is the sponsor of today's video
their Memorial Day sale is running now
through matal so it is the perfect time
to upgrade your mattress you can get 30%
off an elite or Lux mattress plus two
free pillows or take advantage of 25%
off sitewide check out the Helix site
from more details in case you guys don't
already know what sets helix's premium
mattresses apart from other mattresses
is that they're customized to fit your
needs they come all rolled up in a box
and are conveniently shipped to your
door for free within the US everybody is
different and Helix knows that which is
why they made the Sleep quiz to match
your unique body type and sleep
preferences to find the perfect mattress
for you they have something for
everyone's unique taste and if you sleep
with a partner you can even take the
Sleep quiz together and find something
that's the perfect compromise for both
of you Josh and I were matched with
their midnight Lux mattress which is a
medium feel mattress in the perfect fit
for side and stomach sleepers like Josh
and I we've had it for over 3 years now
and it is my Saving Grace at the end of
every single day especially during
lamming season which is what we're in
right now I've been up every single
night bottle feeding baby lambs and then
crawling back into my bed and thankfully
falling right back to sleep and waking
up well rested the next day the Helix
lineup offers 20 unique mattresses
including the Helix Plus for Big and
Tall sleepers the Lux which is the
collection that our is from also the
elite and the kids line which is what
Ellie has we have all been sleeping so
well over here but if it makes you
nervous to buy something that you
haven't tried before Helix offers a 100
night sleep trial to ensure that you
love it plus there's a 10-year warranty
and they even offer financing options
and flexible payment plans we love our
Helix mattress and think that you would
too their Memorial Day Early Access sale
is running now through May 12th so if
you're interested in upgrading your
mattress now is the perfect time to do
it you can get 30% off an elite or Luxe
mattress plus two free pillows or take
advantage of 25% off sitewide head to
helixsleep.com Wild Wonderful or click
our Link in the description box below
[Music]
[Laughter]
today we're going to start working on
framing up the back wall in Ellie's Loft
we still have a little bit of framing to
do down where the rafters on the back
side of the house come down through the
closet in Ellie's room but once that's
done we're going to be able to sheath
that entire back portion of the house
the best thing to do is to put a 36 in
window right there and have it be
roughly 4T tall the priority for the
windows in the loft is a double hung
window we love the triangle style
windows we have in the front of the
house but they're casement style so they
roll and they open up like 6 in we need
a window that goes up just in case
there's a fire and she has a fire escape
to get out of the window of the third
floor so the first thing we got to do is
put the top plates up and then we'll
finish with 2x6
studs 23 and A2
Your Love Run free honey you can count
on me you in the and just see we can
drive all
night on the highest shelf you can't
reach Hey kid you can count on me when
you need to get away we can wave
goodbye honey count on me never let you
down I'll be with you the pass SE
[Music]
come on
buddy here
little you're too big
Hy start giving him the four one I think
so chug hamy chug chug hamy
chug before we get started on sheathing
the back wall I need to finish up the
Raptors behind me I got to cut them down
drop them down to that knee wall attach
them all together and get another one
from the knee wall up to the LVL once
that's done we can frame the wall up and
then start sheathing the rafs at the end
of the house are doubled up they're
locked into the knee wall we're drilled
and anchored from
underneath up top right there we're
attaches to the LVL I have a bracket
with 3/8 bolts going in there and it's
all locked in
place now what boss girl top pl's 89
once that's done stud sheath and uh we
call it
[Music]
come want do a little more there you go
J take down there you go that's what I'm
talking about good now
over that how you looking
all right that's it girl next one got it
got
it you
girl me
me you ready for the nail
gun right through
here
sure nails
coming
up yeah coming
up come on get it come on
[Applause]
[Music]
[Music]
you can feel it you can hear it too
tempature dropping rain drops Thunder a
little bit of wind it's going down baby
it's coming going down rain's here guys
it's time to go
inside's coming
[Music]
got
[Music]
it's the cafe has been open for 3 weeks
now we're getting ready to open back
back up this morning to do it all over
again the pastries have been selling out
like hot cakes every single day and
today Deana has a special for lunch
chickpea and spinach Curry everybody has
been so stoked about this it got rave
reviews yesterday so I'm sure it's going
to be a hit all weekend long so this is
a chick pea and spinach Curry so it's
full of chickpeas and um onions garlic
ginger different curry spices coriander
coconut milk and then we're going to top
it with more crispy chickpea cilantro
sour cream and then we have it with
buttermilk on which we're going to brush
garlic butter
on it's crazy to see people pull up and
arrive early waiting for those doors to
open and once those doors open it's game
on yeah it doesn't stop like you might
get 5 minutes here and there but
it's good news it's good
news you
guys you got J you're welcome have a
great day than you thank you wish you
the best here thank you thank you how
you
do about a half hour left we're closing
out of breakfast and moving into lunch
the number one seller was the uh egg
Sammy the fashi bread with the secret
sauce on top it's top notch
all
day
night summer when you get
[Music]
[Music]
how many donkeys that make guys eight
eight yep yeah so what's the donkey's
name I don't know yet his name is
St let's name her um Rosa Rosa that's a
good one with Springtime comes a ton of
rain a ton of lambs and this year our
very first baby donkey
name
Stanley have not agreed on that yet
nope of course he wants an apple you're
a good boy Phil's Mom finally had her
baby and his name is sty he has the
cutest little
white what to call that thing B
bangs all natural these two right here
are standing this my favorite actually
that's
Dash he's like screw the herd you hang
out with us don't you love him look how
sweet he is
[Music]
P down on me
[Music]
5.0 / 5 (0 votes)
CABIN gets a MASSIVE Addition!
125 Year Old Building Renovated in 1 Year Start to Finish | Opening Day
Light At The End Of The Tunnel!
EXTREME KITCHEN RENOVATION EP2 | Demo, Cathedral Ceiling & Doubling The Size
EXTREME KITCHEN RENOVATION EP 4 | Custom French Doors & Restoring 90-Year-Old Windows
EXTREME KITCHEN RENOVATION EP 5 | Designing Our Custom Cabinetry